From: route@monster.com
Sent: Friday, August 19, 2016 10:52 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Kenneth W. Sims 2750 Butler
Rd League City, TX.
77573 ksims68@yahoo.com kensims1968@gmail.com Mobil: 832-425-0993 TRAINING/CERTIFICATIONS Advanced Primavera (P6) Training-Innovative
Management Controls- April, 2009 Turnaround Management Company –
Planning/Scheduling Utilizing Primavera (P5/P6) Microsoft Project Training - 2003 EDUCATION: Central High School, Delhi, La – Graduated
in May, 1968 Hinds Junior College, Raymond, Ms,
Graduated in May, 1971 (Associate Degree in Accounting) PROFESSIONAL EXPERIENCE
9/13 – PresentThe Weitz
Company/Orascom E&C-USA Senior Scheduler · Direct hire salary position, assigned to Beaumont project
site. · Assigned as Senior Scheduler responsible for building
schedule from Engineering, Procurement, through Construction (EPC). · Liaison with all respective Contractors to integrate their
Schedules into a Master Schedule for Client. · Advise and counsel Contractor Schedulers to correct bad
logic ties, resource loading errors, and poor critical path definitions. · Assist field planners in constructing precise job plans
that adhere to basic scheduling formats. · Organize and conduct weekly meetings to address weekly
goals and to correct any noted deficiencies and time lags. · Produce histograms and reports as requested by Client. · Define resource allocations and requirements and inform
Contractors of required manpower. · Maintain and execute Construction Schedule from Civil
phase through Commissioning phase. 3/13 – 9/13Fluor Engineering Project Controls Specialist · Hired by Fluor to mobilize to Saudi Arabia, assigned to
construction of Aluminum Rolling Mill Project · Duties consist of working as consultant to Samsung
Engineering & Construction · Conducted daily field walk-throughs with Samsung and
Subcontractors · Analyzed Critical Path and advise of methods and plans to
mitigate deviations · Advised Joint Venture Team of Milestone slippages and
recommended corrections · Worked with Subcontractors to insure daily schedules are
being followed and suggest alternative
work solutions when scheduled work was not feasible · Produced histograms and manpower charts as requested for
client analysis 6/12 – 3/13Odebrecht Engineering, Pasadena
Refining System Senior Scheduler · Employed as salaried scheduler directly for Odebrecht
Engineering · Worked to develop multiple Capital Project schedules · Responsible for weekly updates on multiple Capital
Projects · Duties included analyzing Critical Path and reporting
slippage on Critical Milestones · Developed P6 Schedule, from Engineering/Procurement
through Construction Phases · Mentored Junior Schedulers in all phases of Project
Development 12/10 – 6/12 BP, Texas City Refinery TAR Scheduler · Worked as direct-hire salary position directly for BP · Responsible for complete schedule construction, beginning
at planning stage · Worked with large projects with 30k(+) activities · Scheduled projects for Catalytic-Cracking Unit and
Ultracracker Unit · Integrated Contractor Schedules into Master Schedule · Met on regular basis during TAR to justify and report on
critical path and/or slippages · Organized data, as requested, into Excel spreadsheets and
associated graphs, charts. 4/10 -12/10 Luster National – New Orleans,
Louisiana Senior Scheduler •Assigned as a
Senior Scheduler and Quality Assurance Manager
• Worked with Army Corps of Engineers •Responsible
for working with Project Managers to analyze and maintain (45) projects
•Duties included assigning/leveling resources, financial assignments,
maintaining and progressing all activities.
•Met on regular basis with Project Managers and Project Analysts to discuss
all issues as they related to respective
projects.
6/09 – 4/10ThyssenKrupp Steel, USA –
Mobile, Alabama Planner/Scheduler · Continued developing EPS Level III P6 Project schedule for
new steel plant erection · Worked with (3) other schedulers to coordinate, code,
organize, and sort schedule containing approximately 3,000 tasks for each
Product Line # (4 lines total) · Created formatted schedule prior to arrival of
Construction Contractors · Worked with contractors to assist schedulers in creating
lower level schedule that supported integration into our schedule 8/08 – 4/09Bay Area Industrial Contractors
– Bayer Chemical Plant Planner/Scheduler · Developed and maintained P6 schedules for multiple
projects. · Collected data (manpower estimates w/ durations), entered
their work tasks, and maintained the entire schedule and reported daily, or
as requested, to Bayer. · Assisted Project Superintendents and General Foremen in
developing a manpower requirement for assigned tasks within the Turnaround
Projects. · Developed look-ahead reports and Progress reports to
ensure resources are being used correctly and allocated accordingly. 10/05 – 8/08LWL Inc. – ExxonMobil Planner/Scheduler · Developed and maintained P5 schedules for multiple
projects. · Collected data from various contractors, entered their
work tasks, maintained the merged schedule to report weekly to ExxonMobil. · Developed bid proposals for LWL and submitted project bid
letters to ExxonMobil for review and/or approval. · Assisted Project Superintendents in developing and
updating weekly reports to reflect completion status and cost-tracking
updates. · Developed look-ahead reports and assisted Project
Superintendents in assuring resources were being used correctly and in the
correct numbers and locations. · Developed manpower and progress reports using the P5
Schedule for tracking purposes. 09/04 – 10/05KBR Labor Foreman/Site Manager – One year
contract in Baghdad, Iraq
· Worked as supervisor of a crew of Iraqi Nationals
performing various job assignments as required. · Promoted to Site Mgr - managing camp of app. 800 clients,
70 Iraqi Nationals, and 6 Labor Foremen. · Job consisted of coordinating all maintenance tasks, documentation
of all work, payroll, and numerous other duties required to maintain camp. 05/03 – 09/04JV PIPING Pipefitter (Turnaround Jobs) Clients: Valero, BP Amoco, and Shell in
Deer Park · Work included all duties associated with removing old
piping and installing new revised piping. · Worked with welders to fabricate piping, and all related
pipefitting duties in a chemical plant environment. · These projects included various shifts and extended
overnight travel out of state in some cases. 10/83 – 05/03Goodyear Tire and
Rubber/Chemicals Maintenance Supervisor/Planner-Scheduler (07/01/96 -
05/27/03) · Management duties began as a Maintenance Supervisor
working rotating 12-hour shift responsible for maintaining plant operations
as required. · Involved in all aspects of the Operations of the Goodyear
Chemical Plant. · Worked with, and advised, operators of valve line-ups as
well as trouble-shooting all equipment in all areas of the plant. · Duties as the Maintenance Supervisor were for all
activities related to Sheet Metal Dept, Machinist Dept, Mechanic Dept, and
Pipefitter/Welder Dept. · Responsible for acting as liaison between the Emissions
Control contractors and Goodyear. I received their documentation on any
non-compliance items and assigned the respective crafts to make the repairs
and return the documentation for re-testing. · Planned Mechanical and I/E shutdowns and maintenance
operations. · Duties also included all personnel and discipline duties,
job assignments and planning responsibilities, ordering and maintaining tools
and materials, and maintaining records and files of all associates and
equipment as needed. · Responsible for all planning and scheduling of Plant
and/or Unit outages, including manpower projections and ordering of all parts
and materials Journeyman Pipefitter (10/10/83 - 07/01/96) 09/74 – 10/83Pipefitters Local Union #211 –
Houston area |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|